MANUFACTURING FOR THE REPAIR OF MINING EQUIPMENT UNITS
Description
Main goal of the project is to organize a modern production facility for the repair and restoration of mining equipment units with an independent fuel and lubricants laboratory, automobile repair shop and a central warehouse. Creation of a new production facility with modern technologies and equipment with improved environmental conditions and working conditions.
The design solutions provide for the implementation of repair and restoration work of individual structural elements and parts of the building.
Production building is the one-story frame building.
In the building it is planned to organize: Manufacturing for the repair and restoration of mining equipment units; Central warehouse (for temporary storage and storage of spare parts for trucks and special equipment); Laboratory of fuels and lubricants (in the right side of the administrative building); Automobile repair shop for parking and repair of trucks with an inspection pit (in an existing single detached building).
Total building area
15,466 square meters
266,723 cubic meters
Scope of project included:
Design development, Construction documentation
GENERAL PLAN
Painting area
Machining area
Repair area of internal combustion engine (ICE)
Machining area
Repair of units
Repair of units
Surface preparing area
Central warehouse
Central warehouse
Repair of units
Repair of units
Repair of units